Construction on the covered walkway between the parish hall and the new building has started, and as a result the covered porch and steps outside the parish hall have been removed. The double-door exit/entrance in the parish hall has been blocked from the inside to prevent accidents. Most of the grassy lawn outside the parish hall is now fenced off for this construction work. For more information and photographs, check out the construction journal at this link: http://www.christchurchvaldosta.org/?page_id=2985